is ready!!
Congratulations on the completion of your dream home!
-
days
Stages Learn more
-
Plot size 1,000 Sq. ft.
-
Built-up area 1,200 Sq. ft.
-
No. of floor 3 floors
-
Location Tier 2 flat land city
-
Weather conditions Uninterrupted by rains & harsh weather
Regional variations, labor availability, and other circumstances may impact your construction time. Consult a local experts for a more specific timeline.
-
Planning & Design
Hire an architect, finalize design style, and prepare a structure...
45 days -
Land preparation & approvals
Obtain building permits, clear the site, and secure panchayat...
45 days -
Foundation
Excavate and level land, Pour concrete footing and install rebars...
45 days -
RCC Structure
Construct columns, construct beams, construct slabs
45 days -
Brickwork
Build walls, install lintels, and leave openings for doors and wi...
45 days -
Plumbing
Lay drainage pipes, water supply lines, and install plumbing fi...
45 days -
Electrical work
Hire an architect, finalize design style, and prepare a structur...
45 days